Curtis Power Solutions, working under Starr Electric and Environmental Air Solutions while collaborating closely with Russelelectric as their gear and ATS supplier, played a critical role on the team that designed and implemented a modular Central Utility Plant (CUP) for the new Capital Region Medical Center complex. The new facility—designed for LEED Silver certification and powered by 21st century technology—replaces the aging 75-year-old Prince George’s Hospital Center in Cheverly, MD.
Curtis Power Solutions was selected by water and wastewater utility titan WSSC Water and PC Construction to provide design services and equipment that will service a new facility that treats biosolids from regional water resource recovery plants. The new Piscataway Water Resource Recovery Facility in Accokeek, Maryland will be finalized in 2024 and will feature a new 4.5 megawatt Combined Heat and Power (CHP) system designed to save customers money and create renewable energy.
Combined Heat and Power (CHP) system and emergency backup power system for the new Horseshoe Casino in Baltimore, MD
Converting Biogas at the Back River WWTP into Renewable Energy
Combined Heat and Power (CHP), peak shaving and emergency backup power system for Baltimore's Inner Harbor East Complex