CURTIS POWER SOLUTIONS OFFERS LOAD BANK TESTING SERVICES TO SAFELY PROVE YOUR GENERATOR SYSTEM WILL PERFORM AT ITS FULL CAPACITY IN AN EMERGENCY.
Load bank testing confirms the emergency power supply system’s ability to run up to its rated kW output and stay there without overheating and possibly shutting down during an emergency. Periodic load bank testing is an essential part of any good maintenance program. Load bank testing is not intrusive and during the test, there is no interruption to the facility’s power supply.
Load Bank Testing Benefits
- Allows engine to reach proper operating temperatures and subjects the engine to actual operating conditions.
- Ensures that the generator will reliably operate at its maximum capacity for an extended period of time.
- Prevents and corrects “wet stacking” – a condition where unburned fuel deposits accumulate in the engine and exhaust system reducing the generator set’s efficiency.
- Exposes problems under controlled conditions with a technician present – not when the power is out!
In addition to providing peace of mind, load bank testing is required to ensure compliance with NFPA 110 and Joint Commission standards at hospitals, nursing homes, computer data centers, and other critical facilities.
Curtis Power Solutions has portable resistive load banks in multiple size ranges from 100kW up to 2MW and totaling over 5 megawatts of load bank capacity.
- Our qualified technicians set up the equipment, perform the test procedures for the appropriate length of time and provide a written report detailing the performance of the equipment being tested when complete.
- During a load test, critical engine and generator parameters such as oil and fuel pressure, operating temperatures, voltage, frequency, amperage, and kW output are measured and recorded throughout the duration of the test.
- Typical load bank tests range between two and six hours and the results are recorded in 15-minute increments at up to 100% of the generator’s rated capacity.
- Most backup power systems should be load bank tested to full capacity at least once per year in addition to weekly no-load exercising or monthly transfer testing with available loads.
Load bank testing is the only way to safely test your generator set’s ability to perform without risking a total loss of power or power quality by interrupting utility service. To schedule a load bank test or for more information, please contact us.